Hi all, Everyone has probably noticed that getting anything merged is a real effort at the moment. The main problem is that CI takes in the region of 5-7 hours and then spuriously fails at the end. After 5-7 hours you have to rebase and run CI again and so on. Therefore I propose to run just these four jobs on every MR: validate-x86_64-linux-deb9 validate-x86_64-linux-deb8-hadrian validate-x86_64-windows validate-x86_64-darwin The reasoning is as follows: validate-x86_64-linux-deb9 validate-x86_64-linux-deb8-hadrian These run first and are reliable and finish within an hour. Then we have lots of less reliable, lower priority jobs. Two windows jobs which take forever to run. validate-x86_64-windows validate-x86_64-windows-hadrian One darwin job validate-x86_64-darwin Many more linux jobs validate-x86_64-linux-deb9-unreg validate-x86_64-linux-deb9-integer-simple validate-x86_64-linux-fedora27 validate-x86_64-linux-deb9-llvm validate-x86_64-linux-deb8 validate-i386-linux-deb9 validate-aarch64-linux-deb9 So I don't argue that these are important to test but at the moment they produce too much friction on every commit through a combination of lack of resources and taking too long. Further to this, we really don't need to test fedora27, deb9 and deb8 for every build. When was the last time we broke one of these platforms but not the other, it's rare! So the concrete proposal is to slim back the per commit validation to four jobs. validate-x86_64-linux-deb9 validate-x86_64-linux-deb8-hadrian validate-x86_64-windows validate-x86_64-darwin which will test on the three major platforms. All the other flavours should be run once the commit reaches master. Thoughts? Cheers, Matt

Hi, Am Sa., 2. Feb. 2019 um 16:09 Uhr schrieb Matthew Pickering < matthewtpickering@gmail.com>:
All the other flavours should be run once the commit reaches master.
Thoughts?
That's even better than my idea of only running them as nightlies. In favor!
Cheers,
Matt _______________________________________________ ghc-devs mailing list ghc-devs@haskell.org http://mail.haskell.org/cgi-bin/mailman/listinfo/ghc-devs

It has been established today that Marge is failing to run in batch
mode for some reason which means it takes at least as long as CI takes
to complete for each commit to be merged. The rate is about 4
commits/day with the current configuration.
On Sat, Feb 2, 2019 at 7:57 PM Sebastian Graf
Hi,
Am Sa., 2. Feb. 2019 um 16:09 Uhr schrieb Matthew Pickering
: All the other flavours should be run once the commit reaches master.
Thoughts?
That's even better than my idea of only running them as nightlies. In favor!
Cheers,
Matt _______________________________________________ ghc-devs mailing list ghc-devs@haskell.org http://mail.haskell.org/cgi-bin/mailman/listinfo/ghc-devs

That aside, the CIs don't seem stable at all. Frequent timeouts even before
they start. I have been trying to merge 3 changes for a while now and
everytime one of them times out and I have to restart the timed out ones.
Then there are merge conflicts and I have to start over.
This is "bot wackamole" :)
On Sun, Feb 3, 2019, 13:56 Matthew Pickering
It has been established today that Marge is failing to run in batch mode for some reason which means it takes at least as long as CI takes to complete for each commit to be merged. The rate is about 4 commits/day with the current configuration.
On Sat, Feb 2, 2019 at 7:57 PM Sebastian Graf
wrote: Hi,
Am Sa., 2. Feb. 2019 um 16:09 Uhr schrieb Matthew Pickering <
matthewtpickering@gmail.com>:
All the other flavours should be run once the commit reaches master.
Thoughts?
That's even better than my idea of only running them as nightlies. In favor!
Cheers,
Matt _______________________________________________ ghc-devs mailing list ghc-devs@haskell.org http://mail.haskell.org/cgi-bin/mailman/listinfo/ghc-devs
ghc-devs mailing list ghc-devs@haskell.org http://mail.haskell.org/cgi-bin/mailman/listinfo/ghc-devs

This evening I have fixed the batch mode.
For example: https://gitlab.haskell.org/ghc/ghc/merge_requests/302
Hopefully it should be smoother sailing now.
Matt
On Tue, Feb 5, 2019 at 7:36 PM Phyx
That aside, the CIs don't seem stable at all. Frequent timeouts even before they start. I have been trying to merge 3 changes for a while now and everytime one of them times out and I have to restart the timed out ones. Then there are merge conflicts and I have to start over.
This is "bot wackamole" :)
On Sun, Feb 3, 2019, 13:56 Matthew Pickering
wrote: It has been established today that Marge is failing to run in batch mode for some reason which means it takes at least as long as CI takes to complete for each commit to be merged. The rate is about 4 commits/day with the current configuration.
On Sat, Feb 2, 2019 at 7:57 PM Sebastian Graf
wrote: Hi,
Am Sa., 2. Feb. 2019 um 16:09 Uhr schrieb Matthew Pickering
: All the other flavours should be run once the commit reaches master.
Thoughts?
That's even better than my idea of only running them as nightlies. In favor!
Cheers,
Matt _______________________________________________ ghc-devs mailing list ghc-devs@haskell.org http://mail.haskell.org/cgi-bin/mailman/listinfo/ghc-devs
_______________________________________________ ghc-devs mailing list ghc-devs@haskell.org http://mail.haskell.org/cgi-bin/mailman/listinfo/ghc-devs

Phyx
That aside, the CIs don't seem stable at all. Frequent timeouts even before they start. I have been trying to merge 3 changes for a while now and everytime one of them times out and I have to restart the timed out ones. Then there are merge conflicts and I have to start over.
Indeed Marge was causing a remarkable amount of CI traffic, leading to long queues, and eventually build timeouts. Thankfully Matthew investigated why Marge's batch mode wasn't batching and consequently things should now be much better. Sorry for the previous inconvenience! Cheers, - Ben

So, just checking: is the recommended route to merging now to use the Marge Bot instructions posted previously? (That is, get 1+ approvals and then assign to Marge.) Thanks, Richard
On Feb 6, 2019, at 5:23 PM, Ben Gamari
wrote: Phyx
writes: That aside, the CIs don't seem stable at all. Frequent timeouts even before they start. I have been trying to merge 3 changes for a while now and everytime one of them times out and I have to restart the timed out ones. Then there are merge conflicts and I have to start over.
Indeed Marge was causing a remarkable amount of CI traffic, leading to long queues, and eventually build timeouts. Thankfully Matthew investigated why Marge's batch mode wasn't batching and consequently things should now be much better.
Sorry for the previous inconvenience!
Cheers,
- Ben
_______________________________________________ ghc-devs mailing list ghc-devs@haskell.org http://mail.haskell.org/cgi-bin/mailman/listinfo/ghc-devs

Richard Eisenberg
So, just checking: is the recommended route to merging now to use the Marge Bot instructions posted previously? (That is, get 1+ approvals and then assign to Marge.)
Indeed. I was just sent an email reiterating the previous guidance to the list. Cheers, - Ben
participants (5)
-
Ben Gamari
-
Matthew Pickering
-
Phyx
-
Richard Eisenberg
-
Sebastian Graf